The roof of the Gurjarvani Studio was removed and concrete slab has been put on the top of the 1st floor. This will protect the building from leakage and from the hot Sun.
Now it looks very bright with the new white paint on the walls and ceiling. There is plan to put a Gujarati traditional decorated door as we see in the Poles of Ahmedabad. Once that is put the photo of the building will look different.
Now it looks very bright with the new white paint on the walls and ceiling. There is plan to put a Gujarati traditional decorated door as we see in the Poles of Ahmedabad. Once that is put the photo of the building will look different.